东北老熟女疯狂作爱视频_后入内射国产一区二区_漂亮人妻洗澡被强人人躁_小SAO货边洗澡边CAO你

歡迎您訪問濟南龍岳建材有限公司網站!

咨詢熱線

13905418708

山東水泥立沿石制作工藝流程
來源://newcastle.sh.cn/ 時間:2023-05-07 瀏覽量:0

  山東水泥立沿石制作工藝流程

  The production process of Shandong cement vertical stone

  一、準備工作

  1、 Preparation work

  在進行水泥路沿石制作之前,需要進行準備工作,具體包括以下幾個方面:

  Before making cement curbstones, preparation work is required, including the following aspects:

  1、選購合適的水泥材料,如硅酸鹽水泥等;

  1. Choose suitable cement materials, such as Portland cement, etc;

  2、準備模具,可根據實際需要選購不同尺寸和形狀的模具;

  2. Prepare molds and choose molds of different sizes and shapes according to actual needs;

  3、根據需要準備加固鋼筋、沙子、石子等材料;

  3. Prepare reinforcement materials such as steel bars, sand, stones, etc. as needed;

  4、安排好工具,如批刀、Level儀器等。

  4. Arrange tools such as batch knives, Level instruments, etc.

  二、制作流程

  2、 Production process

  1、模具安裝

  1. Mold installation

  將模具按需擺放在制作區域,注意將其緊密連接,以免水泥流失。在安裝模具過程中要先驗收,確認無誤后左右對稱。

  Place the molds as needed in the production area, paying attention to tightly connecting them to prevent cement loss. During the installation of the mold, it is necessary to first inspect and confirm that there are no errors before symmetrizing left and right.

  2、打地基

  2. Laying the foundation

  清理制作區域內表面的泥土,使其完全干燥,然后進行開挖,在挖掘出的溝槽中鋪設加固鋼筋,并將其固定在地面上。在鋼筋前方堆放磚頭、石子等物品,便于固定模具位置。

  Clean the soil on the surface of the production area to make it completely dry, then proceed with excavation, lay reinforcement steel bars in the excavated trenches, and fix them on the ground. Stack bricks, stones, and other items in front of the steel bars to facilitate the fixation of the mold position.

edd58f8c-4d23-4b46-a10f-8bade2659c26

  3、澆筑水泥

  3. Pouring cement

  現將水泥材料與清水按比例混合,插入模具中,壓實、夯實、震動,排除出現的空氣,將水泥流至模具邊緣上面。在水泥的表層上抹上一層沙漿,使其頂端與模具平滑對齊,打磨成平整。

  Now mix the cement material with clean water in proportion, insert it into the mold, compact, compact, and vibrate to eliminate any air, and flow the cement onto the edge of the mold. Apply a layer of mortar on the surface of the cement, aligning the top of it smoothly with the mold and polishing it to a smooth surface.

  4、去除模具

  4. Remove mold

  在水泥塊定型后,拆除模具,仔細檢查其表面是否平整、光滑。若有突出或瑕疵,可使用批刀進行修整、打磨。

  After the cement block is solidified, remove the mold and carefully inspect its surface for flatness and smoothness. If there are protrusions or defects, a trowel can be used for trimming and polishing.

  5、二次加工

  5. Secondary processing

  取下模具后,應對水泥塊進行打磨和拋光,以增強其表面光澤和防水效果。此外,應將不需要的邊角處用砂紙修磨光滑。

  After removing the mold, the cement block should be polished and polished to enhance its surface gloss and waterproof effect. In addition, unnecessary edges and corners should be smoothed with sandpaper.

  本文由山東水泥立沿石提供技術支持,更多的詳細精彩內容請點擊我們的網站//newcastle.sh.cn/我們將會全心全意為您提供滿意的服務。

相關產品
相關新聞

聯系人:鞏經理 手機:13905418708/18254189888
辦公室地址:濟南章丘區刁鎮瑞祥路5號
廠區地址:濟南章丘區棗園街道吉祥村工業園
備案號: 網站地圖    TXT    XML